EscaTEQ Method Cost Calculator
EscaTEQ Method™
Cost Calculator
Step 1 of 5
Escalator condition classification
Class A
Heavily soiled — a one-time deep clean is required before the EscaTEQ Method can begin
Class B
Moderate accumulation — initial conditioning pass(es) required on first visit before steady-state maintenance begins
Class C
Maintenance ready — suitable for immediate routine implementation
This is an illustrative planning tool only — not a quote or bid. Actual costs vary significantly by site. This estimate is a starting point for conversation, not a basis for contracting.
Full disclaimer →Step 2 of 5
Site inputs
€
Actual operational deployment costs may vary based on supervision, scheduling, taxes, insurance, training, transportation, management overhead, contractor burden, and regional labor conditions.
Step 3 of 5
Cleaning frequency
Cleaning cycles
Method-recommended frequency is pre-selected. You may adjust one tier in either direction.
Step 4 of 5
Deployment & modifiers
Outsourced / BSC — 2.75× burden multiplier applied automatically.
Escalator modifiers
+50% per unit
Optional add-on modules
per-visit add-on, no escalator stoppage required
Step 5 of 5 — Results
Based on your inputs,
here is your estimated annual program cost
This is an illustrative planning tool only — not a quote or bid. Actual costs vary significantly by site. This estimate is a starting point for conversation, not a basis for contracting.
Full disclaimer →