EscaTEQ Method Cost Calculator

EscaTEQ Method™

Cost Calculator

Step 1 of 5

Escalator condition classification

Class A
Heavily soiled: a one-time deep clean is required before the EscaTEQ Method can begin
Class B
Moderate accumulation: initial conditioning pass(es) required on first visit before steady-state maintenance begins
Class C
Maintenance ready: suitable for immediate routine implementation

This is an illustrative planning tool only, not a quote or bid. Actual costs vary significantly by site. This estimate is a starting point for conversation, not a basis for contracting.

Full disclaimer →
Step 2 of 5

Site inputs

If you are not sure, the estimate will use 100 cm because this is the most common standard width.
Actual operational deployment costs may vary based on supervision, scheduling, taxes, insurance, training, transportation, management overhead, contractor burden, and regional labor conditions.
Step 3 of 5

Cleaning frequency

Cleaning cycles

Method-recommended frequency is pre-selected. You may adjust one tier in either direction.

Step 4 of 5

Deployment & modifiers

Cleaning contractor: 2.75× burden multiplier applied automatically.

Escalator modifiers

+50% per unit

Optional add-on modules

Riser spot cleaning is estimated at half the tread cleaning frequency. Treads carry the traffic and most of the soiling, so they are cleaned every cycle. Risers are cleaned on alternate cycles.
per-visit add-on, no escalator stoppage required
Step 5 of 5: Results

Based on your inputs,
here is your estimated annual program cost

This is an illustrative planning tool only, not a quote or bid. Actual costs vary significantly by site. This estimate is a starting point for conversation, not a basis for contracting.

Full disclaimer →

Send me my estimate

Enter your email and we'll send your estimate.

✓ Sent: your estimate is on its way.
No unsolicited calls. Reply to your estimate email anytime to start a conversation.